Auxiliary Equipment

Plastic Recycling
Auxiliary Equipment

Supporting equipment for feeding, opening, sorting, conveying, separation and material handling across complete plastic recycling lines.

Selected according to the material, process layout and production requirements of each project.

FeedSortConveySupport

AI concept visual · not a verified Rayli installation

Equipment Range

Rayli Auxiliary Recycling Equipment

Selected auxiliary machines are integrated around the main recycling process according to each project’s material flow and layout.

Project configuredEquipment types shown are illustrative. Confirm the available Rayli product range and final combination against each project’s process plan.

Integrated Into the Process

Auxiliary Equipment Connects the Main Recycling Stages

Supporting machines help maintain material flow and prepare feedstock before, between and after the core recycling processes.

Incoming Material Bale / Bulk Material
  1. 01 Feed & Open

    Prepare the Feed

    Debaler · Feeding Conveyor

    Supporting equipment
  2. 02 Core process

    Shred / Crush

    Explore Size Reduction
  3. 03 Application dependent

    Prepare & Separate

    Label Remover · Trommel · Air Classifier

    Optional equipment
  4. 04 Core process

    Wash

    Explore Washing Equipment
  5. 05 Material transfer

    Convey Between Stages

    Belt Conveyor · Screw Conveyor

    Layout dependent
  6. 06 Core process

    Dry / Pelletize

  7. 07 Application dependent

    Collect / Bale

    Baler · Collection System

    Where required

Equipment placement varies by line. For PET bottle recycling, label removal is commonly placed before size reduction; final positions depend on the selected process and plant layout.

Configure around the whole processAuxiliary equipment should be selected according to the complete process layout rather than added independently after the main machines are chosen.

Plan material transferStable feeding and material transfer are especially important in high-capacity recycling lines, where bottlenecks between stages can reduce overall system performance.

Complete the Recycling Line

Tell Us Which Part of Your Line Needs Support

Share your material, current process layout, required capacity and the stage you need to feed, sort, convey or support. Rayli will recommend suitable auxiliary equipment.

01 Material 02 Current Process 03 Required Capacity 04 Support Stage

Support StageFeeding · Sorting · Separation · Conveying · Baling · Maintenance

WhatsApp